The head of the security media cell, Lieutenant General Saad Ma'an, confirmed today, Saturday, that the Federal Police have taken control of the three main checkpoints in Jurf al-Nasr. He indicated that the process of replacing security forces and their redeployment is proceeding smoothly and without security obstacles. He estimated that the handover of security responsibility would be completed within less than a month, while also noting the securing of oil pipelines and main roads, as well as control over critical checkpoints in the area.
Ma'an stated in a statement followed by the News Video Agency, that "the security forces are continuing the process of managing the deployment and replacing the troops and handing over responsibilities according to a plan that involves synchronization between the withdrawal of current forces and the entry of alternative troops." He clarified that "the first brigade to leave the area is the first brigade of the 45th Division of the Popular Mobilization Forces, and an alternative force has entered to assume its responsibilities."
He added that "the Energy Police established 12 security points along the oil pipelines over a distance of 5 kilometers and 200 meters, which have been fully secured," noting that "the Federal Police secured the Fadaliyah road extending from the bridge to the Al-Maidan intersection, covering a distance of more than 30 kilometers, by deploying checkpoints and security points."
He pointed out that "the 38th Brigade of the Iraqi Army began securing the Ya Hussein barrier, which represents the dividing line with the Anbar Operations Command, covering a distance of 38 kilometers." He explained that "the work included opening the road extending from the Fadaliyah bridge passing through the Fadaliyah junction and Al-Maidan and Jamilah, reaching Karbala Al-Mukarramah, after it had been closed and only opened during visits."
He continued that "the Federal Police received today three main checkpoints, which are Al-Anwar, Al-Shuhada, and Al-Tahrir, in the presence of identifiers from the Popular Mobilization Forces," noting that "the processes of replacing the forces continue according to the specified methodology, covering the areas of responsibility of the 72nd and 79th Brigades."
Regarding the timeframe to complete the deployment, Ma'an explained that "the process of handing over security responsibility may take a few weeks, perhaps less than a month, due to the need to transport equipment, weapons, locations, communication systems, and organize the movement of military units."
He confirmed that "the security situation is stable, and there are no security obstacles to the deployment process," adding that "some roads and areas need rehabilitation and technical treatment, in addition to the presence of war remnants and explosive materials that require intervention from the military engineering and the Directorate of Explosives Control in the Ministry of Interior and specialized technical teams."
Regarding the return of the displaced, Ma'an indicated that "the government prioritizes the return of the people of Jurf al-Nasr, with the necessity of conducting security checks to ensure the safety of citizens and prevent infiltration by any foreign elements," noting that "some residents of the area are still present there, while the majority live outside."
He clarified that "the current priority is to complete the security deployment and fully assume responsibility, followed by addressing war remnants and explosives, and then moving on to rehabilitating the infrastructure and restoring services in preparation for the return of residents."
He noted that "the 2027 budget will include allocations for requalifying the area and improving its service reality," affirming that "government efforts will continue to strengthen state authority and provide services to citizens in various regions of Iraq."